Skip to content
Flight operationsAircraft & systemsRegulation

Technical log

Also called Tech log, Aircraft technical log, Maintenance log

Updated 28/11/20264 min read
In short

The technical log is the record carried with an aircraft in which the crew enter each flight, every defect found and the fuel and fluids taken on, and in which maintenance records each rectification and release. It shows the next crew, before they accept the aircraft, whether it is airworthy and what is deferred.

Kept byThe operator, on board
Filled inEvery sector, by crew and maintenance
Links toMEL and deferred defects

What it is

The technical log (usually shortened to "tech log") is the operator's record of an aircraft's use and condition, kept on board and filled in every sector. It is where the flight crew say what happened on the flight, and where maintenance say what they did about it. Together those entries tell anyone about to fly the aircraft whether it has been released to service and what, if anything, is not working.

It sits alongside, but is separate from, the pilot's personal logbook. The pilot's logbook records the pilot's experience; the technical log records the aircraft's.

Rules on its content come from the State of the operator. ICAO Annex 6 requires operators to keep maintenance records and to have a system for reporting defects; EASA sets the content of the aircraft technical log system in Part-M; the FAA requires the pilot in command to enter mechanical irregularities in the aircraft's maintenance log. Paper or electronic, the core is much the same.

What goes in it

A typical sector record page has several parts. Layouts differ by operator, but most contain:

PartWhat it recordsWho fills it in
Flight detailsDate, sector, block and flight times, landings, commanderFlight crew
Fuel and fluidsFuel on board before uplift, uplift, departure FOB, oil and sometimes hydraulic fluid addedFlight crew or ground staff
DefectsAny fault, damage or abnormal behaviour seen during the sectorFlight crew (or cabin crew via the commander)
Action takenRectification, troubleshooting or deferral with its referenceMaintenance
ReleaseCertificate of release to service (CRS) after maintenanceAuthorised certifying staff
AcceptanceCommander's signature accepting the aircraft for the next flightFlight crew

Many operators also record de-icing and anti-icing treatment, daily and pre-flight inspections, and the next scheduled maintenance check in the same log.

Deferred defects

Not every defect is fixed before the next flight. If the minimum equipment list allows an item to be inoperative, maintenance can defer it. The deferral appears in the log with the MEL item number, the category or time limit, and any maintenance (M) or operational (O) procedure that has to be applied. Many operators keep a running list of acceptable deferred defects (ADD) at the front of the log so the crew see them all in one place. See deferred defects for how the limits work.

An item deferred under the MEL is not "fine". It can change performance, fuel, dispatch to certain aerodromes or the procedures the crew must use. Reading the deferred items is part of every departure briefing.

What pilots do

  1. Before the flight, check the log. Confirm the last sector has a valid release to service, that there are no open defects without action, and read every deferred item with its conditions. If anything is unclear, ask maintenance before you sign.
  2. Accept the aircraft. Your signature says you have reviewed the status, not that you have inspected the aircraft yourself.
  3. During the flight, note faults as they happen, with the time, phase, indications and any ECAM or EICAS message. A defect written from memory hours later is less useful to the engineer.
  4. After the flight, complete the sector. Times, landings, fuel and every defect. Write what you saw, not your guess at the cause: "No 2 hydraulic quantity indication fluctuating 0.5 to 1.0 in cruise" helps more than "hydraulic sensor faulty".
  5. Hand over in person if you can. Talk the engineer through anything unusual, then make sure it is in the log as well.
Remember: if it is not in the tech log, as far as the next crew and maintenance are concerned it did not happen.
Learn it properlyFlight Operations trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

A worked example

Examplair 123 lands after a sector on which the captain saw the left pack fault caution twice during climb, each time clearing after a few seconds. The crew enter the defect: "PACK 1 FAULT caution momentarily at FL120 and FL190 in climb, cleared by itself, no crew action. Cabin temperature normal."

The engineer cannot find the fault in the time available. The MEL allows one pack inoperative with conditions, so the engineer deactivates pack 1, records the deferral with the MEL item and its time limit, applies the maintenance procedure and signs the release. The next crew read the deferred item, note the operational conditions in the MEL (for example a maximum flight level), adjust their plan and brief them before accepting the aircraft.

Common mistakes

  • Accepting without reading the deferred items. A familiar aircraft on a busy turn tempts you to sign and go.
  • Verbal reporting only. Telling the next crew or a ground engineer is good practice, but it does not replace the entry.
  • Vague defect text. "Noise in cabin" gives the engineer nothing to work with. Location, phase, indications and duration do.
  • Wrong or missing fuel figures. The log's fuel entries are used to check uplift against the fuel gauges and against what the load sheet assumes, so a careless figure can hide a real discrepancy.

Frequently asked questions

Who can write in the technical log?

The flight crew enter flight details and defects; maintenance staff enter rectifications, deferrals and the release to service. Each entry is signed by the person who makes it, under the authority the operator gives them.

Can I fly with an open defect in the log?

Only if it has been rectified and released, or properly deferred under the MEL or another approved procedure with any operational conditions applied. An open, undeferred defect means the aircraft is not ready for flight.

What if I forget to write a defect up?

Write it up as soon as you notice, before you leave the aircraft. A defect reported only by word of mouth is invisible to the next crew and to maintenance, which is exactly what the log exists to prevent.

Is an electronic technical log allowed?

Yes, where the authority has approved the operator's system. It has to give the same information, signatures and protection against alteration as the paper version.

Sources

  1. ICAO Annex 6, Part I: operator's maintenance responsibilities and records
  2. EASA Part-M, M.A.306: aircraft technical log system
  3. 14 CFR 121.563: reporting mechanical irregularities
  4. 14 CFR 121.701: maintenance log
Spotted a mistake, or something missing?Suggest an edit