Skip to content
Flight operationsHuman factorsSafety

Approach briefing

Also called Arrival briefing, Descent and approach briefing

Updated 11/11/20263 min read
In short

The approach briefing is the short talk in which the pilot flying sets out how the crew will fly the arrival, approach, landing and missed approach. It is done before descent, from the charts and the latest weather, so that both pilots share one plan and know the threats before the workload rises.

WhenBefore top of descent, typically
Given byPilot flying, typically
Core itemsWeather, approach, minima, missed approach, threats

What it is

An approach briefing is the moment when the crew agrees on how the end of the flight will go. The pilot flying explains the arrival route, the approach, the landing and the missed approach. The pilot monitoring checks it against the charts, the weather and the flight management system (FMS), and raises anything missing. The result is one shared plan, said out loud before the busy part of the flight.

Most operators require it in their standard operating procedures (SOPs), and most set the order of items. The content is much the same everywhere. It mirrors the departure briefing at the other end of the flight.

When to brief

The usual point is before top of descent (TOD), in cruise, once the latest weather and the expected arrival are known. At that point workload is low and there is time to set up the FMS and the radios calmly.

Briefing during descent or on vectors is possible but costly. Each item competes with ATC calls, speed changes and checklists. If the plan changes late, a short re-brief of what changed is better than none. If even that is not possible, ask ATC for time.

What it covers

Operators publish their own lists. The table shows the items that appear in most of them.

ItemWhat to say
Weather and ATISWind, visibility or RVR, cloud, runway condition, QNH, expected runway
NOTAMsClosed taxiways, unserviceable aids or lights, works
ArrivalSTAR, transition, speed and level constraints, transition level
ApproachChart and date, approach type, final course, frequencies and identifiers
Safe altitudesMSA, and terrain or obstacles that matter
Final segmentFAF altitude or distance, descent rate or profile, stabilisation gate
MinimaDA or MDA, required visual references, approach ban if one applies
Missed approachInitial turn, climb altitude, holding fix, who calls, who flies
LandingFlap setting, autobrake, reversers, landing distance and margin, runway exit
TaxiExpected exit, route to stand, hot spots
ThreatsThe few things today that could go wrong, and the plan for each

Many operators also include fuel: the minimum fuel at which the crew will divert, and to where.

Threats first

A good briefing is built around threats, not around reading the chart. In threat and error management (TEM) terms, a threat is anything outside the crew's control that makes the flight harder: a tailwind on final, a contaminated runway, a high terrain sector, an unfamiliar airport, fatigue at the end of a long duty.

Name the two or three that matter most today. Then say what you will do about each one. For example: "The tailwind is 9 knots, near our limit. If it goes above 10 knots, we go around and ask for the other runway." A briefing like this sets a decision before it is needed, which is far easier than making it on short final.

Learn it properlyFlight Operations trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

A worked example

A short, fictional briefing for an RNP approach on a wet runway:

"We'll fly the RNP Z runway 27, chart dated last week, via the ALPHA 1B arrival. Expect 210 knots until the IAF. MSA is 3,900 ft in our sector. The FAF is at 6.0 miles, 2,000 ft. Minimum is 470 ft baro, LNAV/VNAV. Missed approach: straight ahead to 3,000 ft, then left to the hold at the IAF. Flaps full, autobrake medium, wet runway, landing distance gives us 600 metres spare. Threats: the wind is gusting to 25 knots, so we add the gust increment, and the runway is wet, so no float. Plan to vacate at the end, taxi via ALPHA. Questions?"

It takes about a minute. The pilot monitoring then confirms the chart, the FMS legs, the minimum set and the missed approach altitude.

The missed approach part

The missed approach is the part of the briefing most often rushed, and the part most needed when things go wrong. Say the first turn, the first altitude and the speed limits. Agree who calls "go around" and that either pilot may. See missed approach procedure and go-around.

Common mistakes

  • Reading the chart aloud. It covers everything and highlights nothing. Pick out what matters.
  • Briefing too late, in the descent, with half the attention on ATC.
  • No real threats, or a generic list ("weather, terrain, traffic") with no plan attached.
  • Not re-briefing after a runway or approach change.
  • A one-way talk. The briefing ends with an invitation to question it, and the other pilot should use it.

A briefing does not make an approach safe on its own. It works together with a stabilised approach policy and clear minima.

Frequently asked questions

Who gives the approach briefing?

In most operators the pilot flying briefs and the pilot monitoring checks the charts and the FMS against what is said. Operators set their own split of duties.

What if ATC changes the runway after the briefing?

Brief again. At least cover the new approach, minima, missed approach and any changed threats. If there is not enough time, ask ATC for delay vectors or a hold rather than fly an approach you have not briefed.

How long should it take?

Long enough to cover what matters today and no longer. Reading every number on the chart aloud adds time but not safety; the threats and the plan for them are what count.

Sources

  1. FAA Advisory Circular 120-71B: Standard Operating Procedures and Pilot Monitoring Duties for Flight Deck Crewmembers
  2. ICAO Doc 8168, PANS-OPS, Vol I: Flight Procedures
  3. EASA Air OPS, ORO.FC: flight crew training and crew resource management
Spotted a mistake, or something missing?Suggest an edit