Skip to content
Flight operationsRegulationAircraft & systems

Deferred defects

Also called Deferred defect, Deferred maintenance item, Hold item, Acceptable deferred defect, Carried-forward defect

Updated 28/11/20263 min read
In short

A deferred defect is a known fault on an aircraft whose repair has been postponed under an approved procedure, so the aircraft can keep flying for a limited time. Most deferrals are made under the minimum equipment list, with a set rectification interval and conditions. Each one is recorded in the technical log, and the crew checks them all before accepting the aircraft.

MEL category B3 consecutive calendar days
MEL category C10 consecutive calendar days
MEL category D120 consecutive calendar days

What it is

When something on an aircraft stops working, there are two choices: fix it before the next flight, or postpone the repair. A deferred defect is the second choice made properly. The fault is recorded, assessed against an approved document, given a time limit and conditions, and signed for. Until it is fixed, the aircraft may fly within those limits.

Without deferrals, a reading light or a single inoperative pack valve could ground an aircraft for hours or days away from base. With them, the operator can schedule the repair for when parts and staff are available, while the defect is controlled by a written procedure.

Where the authority to defer comes from

Not every defect may be deferred, and not by just anyone. The main tools are:

DocumentWhat it coversWho approves it
Minimum equipment list (MEL)Equipment that may be inoperative at dispatch, with conditionsThe operator's authority, based on the manufacturer's MMEL
Configuration deviation list (CDL)Missing secondary airframe or engine parts, such as a panel or sealPart of the aircraft flight manual, from the manufacturer
Operator's deferral procedureItems with no effect on airworthiness, often cabin itemsApproved through the operator's maintenance or operations manuals

A defect that affects airworthiness and is not covered by the MEL or the CDL cannot be deferred. It must be fixed, or the aircraft does not fly. The legal framework sits in ICAO Annex 6 and in national rules; in Europe, for example, EASA Part-M sets how defects are handled and Air OPS sets the use of the MEL. See MEL regulation for the approval side.

Rectification intervals

Each MEL item carries a category that sets how long the defect may stay open. The standard categories, used by both the FAA and EASA MMEL frameworks, are:

  • A: no standard interval. The time or number of flights is given in the item's remarks.
  • B: 3 consecutive calendar days.
  • C: 10 consecutive calendar days.
  • D: 120 consecutive calendar days.

The counting rule, usually excluding the day the defect was found, is stated in the operator's MEL preamble. CDL items normally have no time limit but carry performance penalties, such as a weight or fuel-burn correction.

How a deferral works

  1. Report. A pilot or engineer enters the defect in the technical log.
  2. Assess. Maintenance checks whether the MEL, the CDL or an approved procedure covers it.
  3. Apply the procedures. The MEL item may need a maintenance action (marked "(M)"), such as deactivating a system, and an operational procedure (marked "(O)") for the crew.
  4. Placard. The inoperative control or indication is labelled in the cockpit or cabin.
  5. Sign. The deferral is entered in the deferred defects part of the technical log, with the MEL reference, category and expiry, and the maintenance release is issued.
Learn it properlyFlight Operations trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

What the crew checks

At the aircraft, the crew reviews every open deferred defect, not just the new ones. Typical questions:

  • Is each item still inside its interval for the whole planned flight?
  • What do the "(O)" procedures require, and do they affect fuel, performance or the route?
  • Do two items combine badly? The MEL treats items one at a time; the commander has to see the whole picture.
  • Do the conditions of the day, such as icing, night or an ETOPS sector, make an item unacceptable?

Worked example

The fictional Examplair 123 is due to depart at 06:00 on day 9. The technical log shows two open items:

ItemMEL categoryFoundExpires
APU generator inoperativeCDay 1End of day 11
One cabin reading light inoperativeOperator procedureDay 7Per procedure

The APU generator was found on day 1. With 10 calendar days counted from day 2, the item expires at the end of day 11, so the flight on day 9 is inside the interval. The "(O)" procedure says the APU may still be used for bleed air but not for electrical power. The destination has ground power, so the crew accepts the aircraft. If the return flight were planned for day 12, the item would expire before it, and maintenance would have to fix it or use an approved extension.

Remember: "legal under the MEL" is the start of the decision, not the end. The commander accepts the aircraft for this flight, with this weather, on this route.

Common mistakes

Typical errors are checking only the newest item, missing an expiry that falls during a multi-sector day, forgetting the "(O)" procedure once airborne, and treating a placard as a fix. Another is accepting several individually legal defects that together remove the redundancy the flight needs.

Frequently asked questions

Who decides that a defect can be deferred?

Maintenance staff authorised by the operator's maintenance organisation make the deferral and sign the technical log, following the MEL or another approved procedure. The commander then decides whether to accept the aircraft with that defect for the planned flight.

Does the day the defect was found count towards the interval?

Under the common MEL convention the interval is counted in calendar days excluding the day of discovery. Check your operator's MEL preamble, which states the rule it uses.

Can a deferral be extended?

Yes, in limited cases. EASA (ORO.MLR.105(f)) lets an operator with an approved procedure extend the interval of category B, C and D items once, with the authority informed. FAA policy allows a one-time extension of category B and C items only, under an approved MEL extension programme. Category A items cannot be extended.

Is a cabin defect a deferred defect too?

Yes, if it is recorded and postponed. Many cabin items have no effect on airworthiness and are deferred under the operator's own approved procedure rather than the MEL, but they still appear in the technical log.

Sources

  1. ICAO Annex 6, Part I: minimum equipment list and the aircraft technical log
  2. EASA Part-M, M.A.403: aircraft defects
  3. EASA Air OPS, ORO.MLR.105: minimum equipment list
  4. FAA 14 CFR 121.628: inoperable instruments and equipment
Spotted a mistake, or something missing?Suggest an edit