Minimum equipment list (MEL)
Also called MEL, MMEL, Master minimum equipment list, Dispatch deviation
The minimum equipment list (MEL) is the operator's approved document that says which equipment may be inoperative at the start of a flight, for how long, and under which conditions. It lets an aircraft fly safely with some known defects instead of being grounded, using operational and maintenance procedures to cover the loss.
What it is
An airliner has thousands of components, and on any given day a few of them may not work. The minimum equipment list (MEL) is the document that decides which of those defects still allow the aircraft to start a flight. For each listed item it states how many are installed, how many must work for dispatch, how long the item may stay inoperative, and any procedures the crew or maintenance must follow.
The MEL is built from the master minimum equipment list (MMEL), which the manufacturer prepares for the type and the certifying authority approves. Each operator then writes its own MEL for its fleet, routes and procedures, and has it approved by its own authority. The MEL can be stricter than the MMEL but never more permissive.
Why it matters
Without an MEL, any defect would ground the aircraft until it was fixed, even when redundancy makes it safe to fly. With an MEL, the operator can keep flying with a known, analysed defect for a limited time, under conditions that replace the lost function or reduce exposure to it. This keeps the schedule running while keeping safety the same, because every relief has been assessed in advance.
The MEL is also a tool for discipline. Its intervals stop defects from being carried forever, and its conditions make sure the crew knows what is missing and how to work around it.
How an MEL item is read
A typical entry lists the system and item, the repair category, the number installed, the number required for dispatch, and remarks. Remarks often include an (O) for an operational procedure the crew performs and an (M) for a maintenance procedure, such as deactivating or securing the failed part.
`` ITEM 30-xx Engine anti-ice valve (one) CAT C INSTALLED 2 REQUIRED 1 (M) Valve secured OPEN. (O) Expect increased fuel flow on the affected engine. Not to be used for dispatch into known icing if ... ``
The example is illustrative only. Real items, numbers and wording come from the operator's approved MEL.
Repair categories
Most authorities use four categories for the rectification interval. The intervals below are the values used by EASA (CS-MMEL) and the FAA, and followed by many other authorities; the exact rules on counting days and on extensions depend on the authority.
| Category | Rectification interval |
|---|---|
| A | As stated in the remarks of the item (for example, a number of flights or flight hours) |
| B | 3 consecutive calendar days, excluding the day of discovery |
| C | 10 consecutive calendar days, excluding the day of discovery |
| D | 120 consecutive calendar days, excluding the day of discovery |
Related documents
The configuration deviation list (CDL) is a separate document for missing external parts, such as a panel, fairing or static discharger. It usually brings a performance or fuel penalty instead of an operational procedure.
What pilots do
- Check the technical log before every flight for open defects and deferred items.
- Find each deferred item in the MEL and read the remarks, not just the title. Confirm the interval has not expired.
- Apply the (O) procedures: performance penalties, fuel corrections, altitude limits, extra checks or crew actions.
- Look at the flight as a whole. An MEL item that is harmless in summer may matter in icing, on a contaminated runway, on an ETOPS route or at a destination with poor weather.
- Tell the other crew members what is inoperative and how it changes the flight, usually in the departure briefing.
Common mistakes
- Reading only the item title and missing a remark that bans dispatch in certain conditions.
- Forgetting the fuel or performance penalty of an inoperative item, such as an APU that is needed for an ETOPS segment or for engine start at an airport without ground power.
- Not considering combinations: two separate MEL items that are each acceptable can together remove too much redundancy.
- Using the MEL after a failure in flight, after take-off has started, instead of the abnormal checklist.
- Accepting an expired item, or one where the maintenance procedure has not been signed for.
Frequently asked questions
What is the difference between the MMEL and the MEL?
The MMEL is written by the manufacturer and approved for the aircraft type. The MEL is the operator's own version, based on the MMEL, adapted to its aircraft, routes and procedures, and approved by its authority. The MEL may be more restrictive, never less.
Does the MEL apply in flight?
No. It is a dispatch document for the start of a flight. Failures in flight are handled with the abnormal procedures and checklists; the MEL is used again before the next departure.
Can the captain refuse an aircraft that is legal under the MEL?
Yes. The MEL sets what is allowed, not what is wise on every day. The captain can refuse if a combination of defects, weather or route makes the flight unsafe.
What happens to items not in the MEL?
If an item required for safe flight is not listed, it must work. Items with no effect on airworthiness, such as some cabin comfort items, are usually covered by other procedures.
Related terms
Sources
- ICAO Annex 6, Part I: minimum equipment list
- EASA CS-MMEL: master minimum equipment list, rectification interval categories
- EASA Air OPS, ORO.MLR.105 and AMC/GM: minimum equipment list
- FAA 14 CFR 91.213 and 121.628: inoperative instruments and equipment