Skip to content
RegulationAircraft & systemsFlight operations

Maintenance release

Also called Certificate of release to service, CRS, Release to service, Return to service, Airworthiness release

Updated 17/11/20263 min read
In short

A maintenance release is the signed statement that maintenance on an aircraft has been completed to the required standard and the aircraft is fit to be returned to service. ICAO requires it after maintenance; EASA calls it a certificate of release to service and the FAA a return to service or airworthiness release. Pilots check it in the technical log before accepting the aircraft.

ICAO basisAnnex 6, Part I
EASA nameCertificate of release to service
Signed byAuthorised certifying staff

What it is

Every time maintenance is done on a commercial aircraft, someone must formally say that the work is complete and the aircraft can fly again. That statement is the maintenance release. It is signed by an authorised person, usually certifying staff of an approved maintenance organisation (AMO), and it is entered in the aircraft's records, normally the aircraft technical log (ATL).

The release is not about the whole aircraft's history. It covers the work that was just done: a scheduled check, a component change, a defect rectification or the deferral of a defect under the minimum equipment list. Until it is signed, the aircraft is not shown to be fit for service, whatever its other documents say.

The names in use

The idea is the same worldwide, but the words differ.

AuthorityTermTypical form
ICAOMaintenance releaseEntry or certificate after maintenance
EASACertificate of release to service (CRS)Signature block in the technical log or a work package
FAAApproval for return to service; for airlines, an airworthiness release or log entryMaintenance record entry and release form
Some other StatesMaintenance releaseA specific document carried on board, with its own validity rules

In practice most line pilots meet it as a signed entry in the technical log, either on paper or in an electronic log.

What it must contain

ICAO Annex 6 sets the basic content. In our words, a maintenance release shows:

  • what maintenance was done, with a reference to the approved data used (for example the maintenance manual task);
  • the date the work was completed;
  • where applicable, the identity of the approved maintenance organisation;
  • the identity of the authorised person who signed it.

EASA and FAA rules add detail, such as approval numbers, the scope of the certifier's authorisation and how records are kept. The point of all of it is traceability: anyone can later see who did what, to which standard, and who took responsibility for it.

Who is responsible for what

Responsibility is split, and it helps to know where the lines are.

  • The certifying staff confirm the work was done properly and sign the release. They are personally accountable for that signature.
  • The maintenance organisation holds the approval, trains and authorises its certifying staff, and keeps the records.
  • The continuing airworthiness organisation (a CAMO under EASA rules) plans maintenance, tracks deferred items and makes sure checks are not overrun.
  • The operator holds the air operator certificate and is responsible overall for the aircraft being airworthy when it flies.
  • The commander must be satisfied, before departure, that the aircraft is airworthy and that the required release is in place.
Learn it properlyAir Law and ATS trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

What pilots check

At aircraft acceptance, the technical log is the pilot's view of the release. A typical check:

  1. The last entry is closed: every defect has a rectification or a valid deferral, each with a signed release.
  2. Deferred items under the MEL have the right category, a due date that has not passed, and any operational procedures you need to apply.
  3. Scheduled maintenance is not overdue, where the log shows it.
  4. Signatures, dates and authorisation numbers are present and readable.
  5. Nothing has been written since the release that would need new action, such as a defect raised during a walk-round.

If anything is missing, the aircraft does not go. Ask maintenance to complete the entry. It is a short delay against a real legal and safety problem.

Remember: a defect you report after the release opens a new entry. It needs its own action and its own signature before departure.

Worked example

During the walk-round on Examplair 123, the first officer finds a damaged static wick. The captain writes the defect in the technical log. A licensed engineer checks it against the configuration deviation list (CDL), finds that this type may fly with the wick missing, removes the remains, records the CDL item with its reference and signs the release for that entry. The captain reads the entry, checks the CDL item and any limitation or performance correction it carries, and accepts the aircraft. Without the engineer's signature, the aircraft would have had an open defect and could not have departed.

Common mistakes

The usual errors are accepting a log page where the last entry is open, missing an MEL item that expires before the end of the day's flying, and asking for work to be done "quickly" without the release being completed. Another is treating a verbal "it's fine" from a technician as a release: only the signed entry counts. Electronic technical logs make some of this easier, but the commander's check is still required.

Frequently asked questions

Who can sign a maintenance release?

A person authorised by an approved maintenance organisation, or another person the State allows, such as a licensed engineer for certain work. The signature confirms the work was done with approved data and to the required standard.

Is the maintenance release the same as the certificate of airworthiness?

No. The certificate of airworthiness is a long-term document for the aircraft. A maintenance release covers specific maintenance work and must exist each time that work is done.

What should a pilot do if the release is missing?

Do not accept the aircraft. Ask maintenance or the operations centre to complete the technical log first. Flying without a valid release means the aircraft is not shown to be airworthy.

Sources

  1. ICAO Annex 6, Part I: chapter 8, aeroplane maintenance, maintenance release
  2. EASA Part-145: 145.A.50, certification of maintenance
  3. EASA Part-M and Part-CAMO: aircraft technical log and certificate of release to service
  4. 14 CFR Part 43: section 43.9, maintenance record entries; 14 CFR 121.709, airworthiness release or aircraft log entry
Spotted a mistake, or something missing?Suggest an edit