Departure briefing
Also called Take-off briefing, Takeoff briefing, Before take-off briefing
The departure briefing is the short talk the crew holds before engine start in which the pilot flying explains how the take-off and initial climb will be flown. It covers the runway, performance, the SID, the plan for a rejected take-off or engine failure, and the threats of the day, so both pilots share one plan.
What it is
The departure briefing is the crew's agreement on how the next few minutes of flight will go. Before engine start, once the flight management system (FMS) is programmed and the take-off performance is calculated, the pilot flying talks through the take-off, the departure route and the actions for the most likely failures. The pilot monitoring cross-checks each item against the charts and the FMS.
Its aim is simple: when something happens at 140 knots on the runway, neither pilot should have to think about what the other will do. The decisions were made at the gate, with time and a coffee.
Why it matters
The take-off and initial climb pack a lot into a short time: high speed on the ground, a go or no-go decision, close terrain, a turn to make, a level to stop at and a frequency change. Errors here, such as an altitude bust on the SID, a wrong runway or a mis-set flap, are well-known causes of incidents. A briefing that is clear and specific catches many of them before they happen, because it forces both pilots to read the same plan aloud and compare it with the set-up.
A briefing also builds the crew. The captain's tone in it shows whether the first officer is expected to speak up. A briefing that closes with a real invitation for questions makes it easier to challenge later.
What it covers
Operators publish their own briefing format. Most follow the same order, based on threat and error management.
| Item | Typical content |
|---|---|
| Threats | Weather, terrain, runway condition, busy traffic, fatigue, unfamiliar airport, MEL items |
| Runway and taxi | Runway, intersection, taxi route, hot spots |
| Performance | Weight, flap, thrust (full or reduced), V1, VR, V2, runway condition |
| Departure | SID, first fix, initial altitude, transition altitude, speed limits |
| Safe altitudes | Minimum sector altitude and high ground |
| Abnormal plan | Reject criteria, engine failure path, return or take-off alternate |
| Automation | When the autopilot goes in, which modes to expect |
| Questions | An open invitation for the other pilot to comment |
The rejected take-off plan
Most operators define who calls the reject and who performs it. Commonly the captain alone decides and acts, whatever seat is flying. Below a set speed (often 80 or 100 kt) the crew rejects for almost any significant failure. Above it and up to V1, only for a short list such as engine failure, fire or a predictive windshear warning, or if the aircraft is unsafe or unable to fly. After V1 the take-off continues. See rejected take-off.
The engine failure plan
The briefing states which track to follow after an engine failure: the normal SID or the operator's engine-out SID. It also gives the acceleration altitude and where the crew will go next, for example a hold, a return to the departure runway or a diversion. Details are in engine-out procedures.
A worked example
A fictional briefing for a departure from Airport A, with the first officer flying:
It takes under two minutes. Each item can be checked against the FMS, the performance page and the chart.
Good briefings
- Specific to today. "Normal take-off" tells the other pilot nothing. "Early turn below 1,000 ft, watch the speed limit of 210 knots" does.
- Threats first. Start with what is different about this departure, then cover the routine items.
- Short. A long, recited briefing loses the listener after the first minute. Skip what the standard operating procedures already fix.
- Checked against the set-up. The pilot monitoring follows on the chart and the FMS, not from memory.
- Updated. A runway change, a new SID from clearance delivery or a new performance figure means a short re-brief of the changed items before take-off.
Common mistakes
- Reading the same words on every flight, so the briefing becomes background noise.
- Briefing before the FMS and performance are final, then not re-briefing when they change.
- Leaving the abnormal plan vague, for example "we'll see" instead of a track and an altitude.
- A pilot monitoring who listens but does not cross-check.
- Briefing during taxi or while talking to the ground crew, when neither pilot can give it full attention.
Briefings for later phases follow the same idea; see also pre-flight briefing and crew resource management.
Frequently asked questions
How long should a departure briefing take?
Usually two to four minutes. A familiar airport on a good day needs less; a new airport, bad weather or an unusual SID needs more. Length should follow the threats, not habit.
Do you brief again if the runway changes?
Yes. A new runway or SID means new performance, a new track and often a new engine-out procedure. Re-brief the changed items and cross-check the FMS before take-off.
Should the pilot monitoring speak during the briefing?
Yes. A good briefing ends with a question such as "any questions or concerns?", and the pilot monitoring should check the FMS and charts against what is said and raise anything that does not match.
Is the departure briefing the same as the pre-flight briefing?
No. The pre-flight briefing covers the whole flight, often with the cabin crew. The departure briefing is the flight crew's detailed plan for the take-off and climb.
Related terms
Sources
- ICAO Doc 9683, Human Factors Training Manual: crew coordination and briefings
- ICAO Annex 6, Part I: operations manual and flight crew procedures
- EASA Air OPS, AMC/GM to ORO.FC: crew resource management training
- FAA Advisory Circular 120-71B: standard operating procedures and pilot monitoring duties