Skip to content
PerformanceFlight operationsSafety

Engine-out procedures

Also called Engine failure procedures, One engine inoperative procedures, OEI procedures, Engine-out SID, EOSID

Updated 11/11/20265 min read
In short

Engine-out procedures are the planned actions and flight paths a crew follows when an engine fails, mostly during take-off but also en route and on approach. They combine the certified one-engine-inoperative performance of the aircraft with a lateral track, an acceleration altitude and speeds that keep the aircraft clear of obstacles.

Speed after failure (take-off)V2 to V2 + 20 kt typically
Minimum acceleration height400 ft above the runway
Net take-off path clears obstacles by35 ft

What they are

An engine failure is the classic performance emergency. Transport aeroplanes are certified to continue a take-off after losing their critical engine at or after V1, but certification only proves that the aircraft can climb. Engine-out procedures turn that capability into something a crew can fly: a track over the ground, a speed, a height at which to accelerate and clean up, and a plan for what to do next.

The term covers three phases:

  • Take-off and initial climb, the most demanding case, where the aircraft is heavy, slow and close to obstacles.
  • En route, where the aircraft must descend to a level it can hold on the remaining engines.
  • Approach, landing and go-around with one engine inoperative (OEI).

The take-off flight path

After an engine failure on take-off the climb is divided into segments, each with its own configuration and minimum gradient.

SegmentFrom → toConfiguration
FirstLift-off → gear upTake-off flap, gear retracting, V2
SecondGear up → acceleration heightTake-off flap, take-off thrust, V2
ThirdLevel or shallow accelerationFlap retracting, speed increasing
FinalClean → at least 1,500 ftClean, maximum continuous thrust

The second segment usually sets the limit, because the aircraft is still in take-off configuration and must meet a minimum gross gradient, 2.4% for a twin. See second segment climb.

Two versions of the flight path exist. The gross path is what an average aircraft flown well actually achieves. The net path is the gross path reduced by a fixed margin (0.8% of gradient for a twin). Obstacle clearance is checked against the net path, which must clear every obstacle in the take-off funnel by at least 35 ft. More detail is in obstacle clearance on take-off.

Engine-out SID

A published SID is designed with all engines operating (AEO). With one engine failed the aircraft may not reach the required heights in time. The operator's performance department therefore checks every runway it uses and, where needed, designs an engine-out SID (EOSID): a track that avoids the critical obstacles, sometimes a straight climb, sometimes an early turn into a valley or out to sea.

Key points about an EOSID:

  • It is private to the operator and is found in the airport pages or the take-off performance data.
  • It usually starts at a defined point, for example a DME distance or an altitude, and may differ from the normal SID from the first turn.
  • ATC may not know it. The crew must tell the controller what they are doing.
  • It often ends in a hold or at a fix from which the crew can plan a return or a diversion.

What the crew does

Exact actions come from the type's QRH and the operator's procedures, but the pattern is the same on most jet types.

  1. Before V1: reject the take-off for an engine failure, using the standard rejected take-off actions.
  2. At or after V1: continue. Keep straight on the runway with rudder, rotate at VR and pitch for the target speed.
  3. Speed: fly V2, or the speed at failure if higher, up to a limit the operator publishes (typically V2 + 20 kt).
  4. Gear up with a positive rate of climb. No other action below a safe height, often 400 ft, apart from essential memory items.
  5. Track: follow the EOSID or the normal SID, whichever the briefing selected.
  6. Acceleration altitude: level off or reduce the climb, accelerate and retract flap on schedule. The certified minimum is 400 ft above the runway; many operators use a higher value per airport, set by obstacles.
  7. Clean-up: at final take-off speed, select maximum continuous thrust and climb.
  8. Then: run the engine failure or fire checklist, declare the emergency and decide on return, diversion or a take-off alternate.

Worked example

An A320-class twin departs Airport A from runway 27, heavy on a warm day. The briefing selected the EOSID: straight ahead to 4 DME, then a right turn to a holding fix, acceleration at 1,000 ft. The left engine fails at V1 + 5 kt. The pilot flying continues, rotates and holds V2 + 5 kt, the speed at failure. Gear up, straight ahead. At 4 DME the crew turns right as briefed. At 1,000 ft they accelerate, retract flap, set maximum continuous thrust, and call "MAYDAY, Example 123, engine failure, following engine-out procedure, request hold at the fix."

Learn it properlyFlight Operations trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

En route: drift-down

If an engine fails in cruise the aircraft cannot hold its altitude and drifts down to the highest level the remaining engines can sustain. Crews descend at the optimum drift-down speed and thrust set by the manufacturer to make the descent as shallow as possible.

Route planning must show one of two things for the net flight path, within a corridor either side of track: either it keeps a positive gradient at least 1,000 ft above the terrain, or it drifts down to a suitable aerodrome clearing the terrain by at least 2,000 ft on the way (14 CFR 121.191; EASA CAT.POL.A.215 has the same two methods). Over high terrain, operators publish these escape routes with decision points. Long-range twins also plan for engine failure under ETOPS rules.

Approach and go-around

A one-engine approach is usually flown with a reduced landing flap setting and a higher approach speed, as the type requires. The go-around is the critical moment: the aircraft must climb on one engine with the gear down at first. Landing performance must also allow for the go-around climb gradient. Keep the speed above the minimum control speed in the air (see VMCG and VMCA) and do not let thrust asymmetry build up without rudder.

Common mistakes

  • Pitching for a higher speed than V2 to "feel safer", which cuts the climb gradient.
  • Following the normal SID when the briefing selected the EOSID, or the reverse.
  • Starting checklists, or touching thrust levers and fuel switches, too low and without confirming which engine failed.
  • Forgetting to tell ATC, who may then turn the aircraft towards the terrain the EOSID was built to avoid.
  • Reducing thrust on the live engine at the normal thrust reduction altitude out of habit.
Remember: the engine-out plan is made on the ground. In the air, the crew only executes what the briefing already decided.

Frequently asked questions

Is the engine-out SID the same as the published SID?

Not always. The published SID is designed for all engines operating. The operator checks it against one-engine performance and, where it does not work, publishes its own engine-out track, which ATC may not know about in advance.

Why fly V2 after an engine failure instead of a higher speed?

Take-off performance and the obstacle analysis assume the climb at V2 or a little above. Flying faster than planned trades away climb gradient that the obstacle clearance depends on.

What is drift-down?

After an engine failure in cruise the aircraft cannot hold its level and descends slowly to the highest altitude it can maintain on the remaining engines. Route planning must show that this path clears terrain by the margin the rules require, or that an escape route exists.

Do pilots tell ATC they are flying an engine-out procedure?

Yes, as soon as workload allows. A MAYDAY or PAN PAN call with the intention, for example following the engine-out procedure, lets the controller keep other traffic clear.

Sources

  1. ICAO Annex 6, Part I: aeroplane performance operating limitations
  2. ICAO Annex 8: airworthiness of aircraft, performance
  3. EASA Air OPS, CAT.POL.A.210 and AMC/GM: take-off obstacle clearance
  4. EASA Air OPS, CAT.POL.A.215: en-route, one engine inoperative
  5. 14 CFR 121.189 and 121.191: take-off and en-route limitations
  6. 14 CFR 25.111 and CS 25.111: take-off path, no configuration or thrust change before 400 ft
Spotted a mistake, or something missing?Suggest an edit