Clearance delivery phraseology
Also called Departure clearance phraseology, ATC clearance readback, Clearance delivery
Clearance delivery phraseology is the standard wording pilots and controllers use to issue and read back the departure clearance before an IFR flight. The clearance gives the clearance limit, the route or SID, the initial level, the squawk and other details, and the pilot reads back the key elements so errors are caught on the ground.
What it is
Before an IFR flight starts, the crew needs an ATC clearance: permission to fly the filed route under air traffic control. At larger airports a dedicated position, called clearance delivery or simply "Delivery", gives it on its own frequency. At smaller ones, ground or tower does the job.
Because the clearance holds the route, the first level and the squawk, an error here follows the aircraft into the climb. Standard wording and a clear readback are how both sides catch mistakes while the aircraft is still parked.
Elements of a departure clearance
ICAO sets a standard order so pilots know what to expect and can write it down quickly.
| Order | Element | Example |
|---|---|---|
| 1 | Aircraft identification | Example 123 |
| 2 | Clearance limit | Cleared to Airport B |
| 3 | Route or SID | SAMPL 2B departure, flight planned route |
| 4 | Level | Climb to altitude 5,000 ft / flight level 70 |
| 5 | Other information | Squawk, departure frequency, slot time, restrictions |
The clearance limit is usually the destination aerodrome. Sometimes it is a fix, when the route beyond it is not yet coordinated; the crew then expects further clearance before reaching it.
The route for most departures is a SID followed by "flight planned route". If ATC changes anything, the new route is given in full.
The level is the first level to climb to, often the SID's stop altitude. The way levels are spoken, altitude in feet or flight level, follows the rules in time and altitude in phraseology.
Other information typically includes the transponder code (see squawk codes), a departure frequency if it is not on the chart, a slot or CTOT, and sometimes the runway in use.
The exchange
Requesting the clearance
The pilot calls with the callsign, the stand, the ATIS letter and, where the procedure asks for it, the aircraft type and destination.
Receiving it
A typical ICAO-style clearance:
"Example 123, cleared to Airport B, SAMPL 2B departure, flight planned route, climb altitude 5,000 feet, squawk 4621."
The pilot reads back the key elements, ending with the callsign:
"Cleared to Airport B, SAMPL 2B departure, flight planned route, climb altitude 5,000 feet, squawk 4621, Example 123."
The controller replies "Example 123, readback correct", and often adds the next step, such as "contact Ground 121.8 for push-back".
US style
In the United States the order is usually summarised by pilots as limit, route, altitude, frequency, transponder. An example:
"Example 123, cleared to Airport B via the SAMPL2 departure, then as filed. Maintain 5,000, expect flight level 350 one zero minutes after departure. Departure frequency 124.35, squawk 4621."
"Climb via SID" is used in the US and in a number of other States when the SID itself contains the altitude restrictions. It means fly the SID's published vertical profile to the top altitude given. Other States use "climb via SID to" a stated level, as in ICAO PANS-ATM.
Datalink departure clearances
At many busy airports the clearance comes by datalink rather than voice:
- DCL (departure clearance) is used in Europe and elsewhere. The crew requests it from the flight deck system, receives the full text, checks it and sends an acceptance.
- PDC (pre-departure clearance) is the system used at many US airports, delivered through the airline's own ACARS link.
Datalink reduces radio congestion and misheard numbers. It does not remove the need to check: the text must be compared against the flight plan, the FMS and the chart, and local procedures say what to confirm by voice at first contact. If anything is unclear, ask for the clearance by voice.
Writing it down
Most crews copy the clearance in a fixed layout on the flight plan or a notepad: limit, SID, level, squawk, frequency, slot. Write first, then read back from what you wrote, not from memory. Numbers follow the rules in transmission of numbers.
A worked example with a change
Example 123 has filed the SAMPL 2B departure from runway 27 at Airport A. Delivery says:
"Example 123, cleared to Airport B, DEMOR 1C departure, flight planned route, climb flight level 70, squawk 4621."
The pilot monitoring writes it down and reads it back in full. The SID has changed, so after the readback the crew:
- Re-programmes the SID in the FMS and checks the waypoints against the chart.
- Checks whether the new SID changes the runway or the take-off performance.
- Checks whether the engine-out procedure still applies.
- Re-briefs the changed items, as covered in departure briefing.
Common mistakes
- Reading back from memory instead of from notes, and swapping digits in the squawk or level.
- Hearing the SID you expected instead of the one ATC gave.
- Missing "flight level" versus "altitude" when the transition altitude is low.
- Accepting a datalink clearance without comparing it to the FMS.
- Not reading back a changed route in full, or leaving out the callsign.
When unsure, ask: "Say again the SID" costs a few seconds; a wrong departure can cost separation.
Frequently asked questions
What does "cleared flight planned route" mean?
It means the route after the SID or first point is the one in the filed flight plan. Check that the FMS route matches the filed plan, not an older company route.
Do you have to read back the whole clearance?
You must read back the safety-related parts: the clearance limit if given, the route or SID, levels, the squawk, frequencies and any speed or time restrictions. Local procedures may ask for less on some items, but never skip levels or the SID.
What if the clearance is different from the flight plan?
Read back what ATC said, then sort out the difference. Re-programme the FMS, recheck performance if the runway or SID changed, and re-brief the changed items before take-off.
Do you read back a datalink clearance?
Usually not by voice. You accept it through the datalink system, and local procedures say whether any voice confirmation, such as the squawk or the ATIS letter, is needed at first contact.
Related terms
Sources
- ICAO Doc 4444, PANS-ATM: chapter 4 and chapter 12, clearances and phraseology
- ICAO Doc 9432, Manual of Radiotelephony
- ICAO Annex 10, Vol II: communication procedures
- FAA Aeronautical Information Manual, chapter 4, section 4: ATC clearances
- FAA Order JO 7110.65: clearance items and phraseology