Unstable approach
Also called Unstabilised approach, Unstabilized approach, Rushed approach
An unstable approach is one that fails the operator's stabilisation criteria at the gate or later: off the path, fast or slow, not configured, sinking too fast or with thrust out of place. The standard answer is a go-around. Most unstable approaches start well before the gate, and the hard part is recognising one early and acting on it.
What it is
An approach is unstable when it does not meet the operator's stabilised approach criteria at the stabilisation gate, or stops meeting them below it. In practice that means one or more of: off the lateral or vertical path, airspeed outside the allowed band, not in the landing configuration, a rate of descent well above what the path needs, or thrust not spooled up. The criteria and the gate height are set by the operator, typically 1,000 ft above the aerodrome in instrument conditions and 500 ft in visual conditions.
The stabilised approach article covers the criteria themselves. This one covers the other side: how approaches become unstable, how to see it coming, and why crews so often land from them anyway.
How approaches become unstable
Very few approaches go wrong at the gate. The energy problem is usually created many miles earlier, and the gate is simply where it becomes visible.
| Cause | What it looks like on final |
|---|---|
| Short vectors or a direct-to the final fix | High on the profile, speed brakes out, flaps late |
| Speed held high by ATC close in | Fast at the gate, configuration incomplete |
| Late runway change | Briefing rushed, FMS changed at low level, path not set |
| Unexpected tailwind on final | Steep descent, speed creeping up, high ground speed |
| Automation mode not as expected | Aircraft levels off or descends at the wrong rate |
| Wind shear or gusts near the ground | Large speed swings, thrust hunting |
| Visual illusions (sloping runway, black hole) | Path too high or too low with the crew feeling it is correct |
The common thread is lack of time. Anything that compresses the approach takes away the minutes the crew needs to configure, slow down and settle on the path. A continuous descent final approach flown from a well-planned descent leaves margin; a "slam-dunk" leaves none.
Recognising it early
The useful moment to act is not the gate but the point where the energy plan stops adding up. Simple cross-checks help:
- Height against distance. A common rule is about 300 ft per nautical mile on a 3° path. At 10 NM from touchdown that is roughly 3,000 ft above the runway. Being 1,000 ft high at that point means you need either extra track miles or a lot of drag.
- Speed against distance. If the aircraft is still at clean speed inside about 12 NM, the deceleration and configuration still to come must fit into the time left.
- Trend, not snapshot. A speed of Vapp + 15 that is decaying is very different from one that is rising.
The pilot monitoring is the main defence. Standard callouts such as "speed", "sink rate", "glideslope" or "not stable" give the pilot flying the information and put the deviation on the record of the flight deck. A pilot flying who is busy fixing a high approach often has the least capacity to judge whether the fix is working; good monitoring skills are what make the call happen on time.
The go-around decision
If the criteria are not met at the gate, the standard response is a go-around. Below the gate the same applies to any significant deviation. The decision should be simple by design: the gate exists so that the crew does not have to judge, at 500 ft and under pressure, whether this particular approach can still be saved.
Worked example
A fictional crew is cleared for a visual approach on a short downwind in an A320-size aircraft. They turn final at 4 NM, 1,600 ft above the runway, at 180 kt with flap 2. At 1,000 ft they are on the path but at Vapp + 25, sinking at 1,400 ft/min, with the landing flap just selected and thrust at idle. The pilot monitoring calls "speed, sink rate". At 500 ft the speed is Vapp + 12 and the sink rate is reducing, but thrust is still at idle.
The approach is unstable at both gates. The correct action is a go-around, even though the runway is in sight and it "looks fine". Landing from this position risks a long, fast touchdown, a float, a bounced landing or a runway excursion.
Why crews continue
Industry studies have repeatedly found that most unstable approaches are continued to a landing, even though almost every operator's procedures say to go around. Some of the reasons:
- Plan continuation bias. The closer the aircraft is to the goal, the stronger the pull to finish the plan.
- Normalisation. Most unstable approaches end in a normal landing, which teaches the crew that continuing works.
- The go-around feels like a failure. It costs fuel and time, and can feel like an admission of error.
- Workload. A crew fixing the energy problem may not notice the gate pass, or may have no capacity left to make the decision.
- Authority gradient. A junior pilot monitoring may hesitate to call a go-around on a senior captain.
- Go-around risk. Some crews see the go-around itself as risky and choose what feels like the lesser evil.
Operators counter this with a clear no-blame policy for go-arounds, procedures that let either pilot call one, and flight data monitoring that tracks unstable approaches as a trend rather than as individual faults.
Common mistakes
Accepting a short approach or a high speed close in without saying "unable"; leaving configuration until the last moment; trying to fix a high approach with idle thrust and speed brakes below 1,000 ft; continuing past the gate "because it is nearly there"; and pilot monitoring calls that describe the deviation but never say the words "go around" when the SOP allows them to.
Frequently asked questions
Is an unstable approach a violation?
Being unstable at the gate is not in itself a violation; continuing to land from it usually is, because operators' procedures require a go-around. Most operators treat a go-around from an unstable approach as the correct, expected outcome and do not penalise it.
Can the pilot monitoring call the go-around?
In many operators, yes. Procedures differ: some let either pilot call it and require the pilot flying to respond, others have the pilot monitoring call the deviation and the captain decide. Know your own SOP before you need it.
What if ATC gave me the short approach?
You can refuse it. Saying "unable" or asking for extra track miles costs a few minutes; accepting a clearance you cannot fly stable leaves the risk with you, not with the controller.
Does a long runway make continuing acceptable?
No. A long runway changes the margin on stopping distance but not the other risks of an unstable approach, such as a hard landing, tail strike, bounce or loss of control close to the ground.
Related terms
Sources
- ICAO Doc 8168, PANS-OPS, Vol I: stabilised approach procedures
- EASA Air OPS, CAT.OP.MPA.115 and its AMC: approach flight technique
- FAA AC 120-71B, Standard operating procedures and pilot monitoring duties for flight deck crewmembers