Stabilised approach
Also called Stabilized approach, Stable approach criteria, Stabilisation gate
A stabilised approach is one where, by a set height, the aircraft is on the correct path, in the landing configuration, at the right speed and thrust, with only small corrections needed. If any criterion is not met at that gate, the crew goes around. It is one of the most effective defences against runway excursions and hard landings.
What it is
A stabilised approach is an approach flown so that, from a set point onwards, nothing needs to change except small corrections. The aircraft is on the lateral and vertical path, fully configured for landing, at the target speed, with thrust set to hold that speed, and with the checklists done. The point where all of this must be true is called the stabilisation gate.
ICAO requires operators to define stabilised approach criteria in their procedures. The exact values come from the operator and the aircraft manufacturer, but the structure is almost the same everywhere.
Why it matters
Studies of approach and landing accidents keep finding the same pattern: an approach that was too high, too fast or not configured, that the crew kept trying to save instead of going around. The result is a long or fast touchdown, a hard landing, a tail strike or a runway excursion.
A stable approach also frees the crew's attention. When the aircraft is set up early, both pilots can watch the path, the speed and the runway instead of racing to configure. And it makes the landing predictable: the landing distance figures used in planning assume a stable approach crossing the threshold at the right height and speed.
Typical criteria
The values below are typical of airline procedures and of the Flight Safety Foundation recommendations. Your operator's numbers are the ones that count.
| Element | Typical criterion |
|---|---|
| Flight path | On the correct lateral and vertical path; only small heading and pitch changes needed |
| Speed | Not more than target +10 kt or less than Vref (or VAPP) |
| Configuration | Landing gear down and landing flaps set |
| Sink rate | Not more than 1,000 ft/min unless briefed for the approach |
| Thrust | Stabilised, appropriate for the configuration, not at idle |
| ILS | Within one dot of localizer and glide slope |
| Briefings and checklists | Completed |
Steeper approaches, circling approaches and some special procedures have their own briefed exceptions. For a circling approach, for example, the wings must normally be level on final by a lower height, often 300 ft.
The gates
Most operators set the gate at 1,000 ft above aerodrome elevation in IMC and 500 ft in VMC. Some use 1,000 ft for every approach to keep one simple rule. Many also set earlier targets, such as being in the final landing configuration by 1,500 ft, so that the 1,000 ft check is a confirmation rather than a deadline.
A typical exchange at the gate:
`` PM: "One thousand." PF: "Stable, continue." (or) PF: "Not stable, go around, flaps." ``
On aircraft with automatic callouts, the "one thousand" callout is the cue for this check.
What pilots do
- Plan the descent early. Most unstable approaches start with being high on profile 20 or 30 miles out. Use the FMS and the distance to go, and ask ATC for track miles.
- Slow down and configure in time. Speed and drag are much easier to manage above 3,000 ft than below 1,000 ft.
- Make the gate call explicit. Both pilots should say it, not just think it.
- Go around when the criteria are not met. Fly the go-around as briefed, without debate.
- Keep monitoring below the gate. A tailwind gust or wind shear can destabilise an approach late. The same criteria apply until the flare.
Common mistakes
- Accepting a short-cut from ATC that leaves the aircraft high and fast, then trying to fix it with speedbrakes below 1,000 ft.
- Continuing an approach that is "almost" stable because the runway is long, the weather is good or the flight is late.
- The pilot monitoring seeing a deviation but not calling it, often because of a steep authority gradient. Good CRM makes the call normal.
- Setting idle thrust to lose speed on short final, which leaves the engines slow to respond if a go-around is needed.
Frequently asked questions
Can I correct an unstable approach below the gate?
The point of the gate is that you don't try. If the criteria are not met at the gate, the standard response is a go-around, not a last-moment fix.
Why 1,000 ft in IMC and 500 ft in VMC?
In cloud the crew has less information and less time to judge the final part of the approach, so the decision is taken higher. Many operators simply use 1,000 ft for all approaches.
Does a stabilised approach still apply after the gate?
Yes. If the approach becomes unstable after the gate, for example a large speed or path deviation at 300 ft, the crew still goes around.
Who can call the go-around?
Either pilot. Most operators state that a go-around call from the pilot monitoring must be followed, and that no one is criticised for a go-around made for good reason.
Related terms
Sources
- ICAO Doc 8168, PANS-OPS, Volume I: flight procedures and stabilised approach
- ICAO Annex 6, Part I: operating procedures
- FAA Advisory Circular 120-71, Standard Operating Procedures and Pilot Monitoring Duties
- FAA Airplane Flying Handbook: approaches and landings
- Flight Safety Foundation, Approach-and-Landing Accident Reduction (ALAR) Tool Kit