Obstacle clearance on take-off
Also called Take-off obstacle clearance, Net take-off flight path, Obstacle-limited take-off
Obstacle clearance on take-off is the performance requirement that an aeroplane, after an engine failure at the worst moment, can still climb clear of every obstacle along the departure path. It is checked with the net take-off flight path, which is the demonstrated climb reduced by a fixed margin, and must clear obstacles by at least 35 ft.
What it is
Every commercial take-off in a multi-engine transport aeroplane is planned so that an engine can fail at the critical moment and the aircraft can still continue, climb and clear the terrain and obstacles ahead. The runway part of that problem is covered in take-off performance. This article covers the airborne part: the climb from the end of the runway up to a safe height with one engine inoperative (OEI).
ICAO Annex 6 sets the principle. EASA writes the detailed rules in CAT.POL.A.210, and the FAA in 14 CFR 121.189. The method is the same in both: build a conservative climb path, draw the obstacles under it and check the margin.
Gross and net flight path
The gross take-off flight path is the climb the aircraft type demonstrated in certification with one engine inoperative. It starts at 35 ft above the runway at the end of the take-off distance and continues through the climb segments until the aircraft reaches 1,500 ft above the aerodrome or is in the en-route configuration, whichever is higher.
The net take-off flight path is the gross path with its climb gradient reduced by a fixed amount. That reduction is the safety margin for a weaker engine, a less than perfect technique or air that is not quite as modelled.
| Number of engines | Gradient reduction |
|---|---|
| Two | 0.8% |
| Three | 0.9% |
| Four | 1.0% |
The operator must show that the net path clears every relevant obstacle by at least 35 ft vertically. If the path includes turns with more than 15 degrees of bank, the margin rises to 50 ft.
Which obstacles count
Not every mast in the region matters. The rules define an area along the intended track, called the obstacle accountability area or domain. Under EASA rules:
- It starts at the end of the take-off distance available (TODA), or at the end of the take-off distance if a turn starts before the end of the TODA.
- Its half-width starts at 90 m, or 60 m plus half the wingspan for smaller aeroplanes, and grows by 0.125 times the distance from that start point.
- It stops growing at a maximum half-width. That maximum is 300 m when the crew can keep accurately to the track and the track does not change by more than 15 degrees, and 600 m with larger track changes. Without that navigation accuracy, the limits are 600 m and 900 m.
FAA rules express the margin differently: 35 ft vertically, or 200 ft horizontally within the airport boundaries and 300 ft horizontally beyond them.
Turns and bank angle
Turning costs climb performance, so the rules also limit when and how steeply the net path can turn:
- No change of track until the path is at half the wingspan or 50 ft above the end of the take-off run, whichever is higher.
- Up to 400 ft, the path assumes no more than 15 degrees of bank.
- Above 400 ft, up to 25 degrees of bank may be planned.
The loss of climb gradient in the turn must be included in the calculation.
Engine-out procedures
Where the straight-out path cannot clear the obstacles, the operator designs a separate track to follow after an engine failure, often called an engine-out SID or engine-out procedure (EOSID). It may turn early away from high ground, or return to a beacon over the aerodrome. Crews must brief it in the departure briefing, including the point at which it separates from the normal SID.
A normal SID is built under PANS-OPS for all engines operating, typically with a procedure design gradient (PDG) of 3.3% or more. It protects the all-engines climb. It says nothing about the OEI climb, which is why the two checks are separate.
Worked example
A twin-engine aircraft at Airport A has a planned gross gradient of 2.4% in the second segment. An obstacle 280 ft high (above the runway end) lies on the extended centreline 3 NM (5,556 m) beyond the end of the TODA.
- Net gradient: 2.4% − 0.8% = 1.6%.
- Height gained over 5,556 m: 5,556 × 0.016 = 89 m, about 292 ft.
- Net path height at the obstacle: 35 + 292 = 327 ft.
- Margin: 327 − 280 = 47 ft. This is more than 35 ft, so the obstacle is cleared.
This example ignores the level acceleration segment and assumes a constant gradient. The real calculation, done by the operator's performance software, models each segment. If the obstacle were 300 ft high, the margin would be 27 ft and the take-off mass would have to come down, or another flap setting or procedure be used.
Common mistakes
- Assuming the SID protects an engine failure. It does not; follow the engine-out procedure when one exists.
- Ignoring temporary obstacles. Cranes near the departure path appear in NOTAMs and must be included.
- Flying a different track. The margin applies only along the track that was analysed.
- Overbanking after the failure. More bank than planned uses up the climb margin.
- Accelerating too early. Levelling off for acceleration below the planned height can put the aircraft lower than the analysed path.
Related topics
Obstacle clearance links to climb gradients, stopway and clearway and the obstacle limitation surfaces that protect the airspace around an aerodrome.
Frequently asked questions
Does following the SID guarantee obstacle clearance with an engine out?
No. A SID is designed for all engines operating. The operator must check the one-engine-inoperative path separately, and may publish an engine-out procedure with its own track.
Why use a net path instead of the real climb?
The real climb of a given aircraft on a given day can be worse than the certified figures because of ageing engines, piloting technique or unexpected air conditions. The fixed reduction gives a margin for that.
What can a crew do if the take-off is obstacle-limited?
Reduce the take-off mass, use a different flap setting or runway, use an engine-out procedure that avoids the obstacle, or wait for better conditions. The performance tool shows which option works.
Related terms
Sources
- EASA Air OPS, CAT.POL.A.210 and AMC/GM: take-off obstacle clearance
- 14 CFR 121.189: airplanes, turbine engine powered, take-off limitations
- EASA CS-25: 25.111 and 25.115, take-off path and take-off flight path
- ICAO Annex 6, Part I: aeroplane performance operating limitations
- ICAO Doc 8168, PANS-OPS Vol II: departure procedures