Aeronautical information regulation and control (AIRAC)
Also called AIRAC, AIRAC cycle, AIRAC date
AIRAC is the worldwide system that makes significant changes to aeronautical information take effect only on fixed common dates, every 28 days. Because the dates are known years ahead and changes are sent out weeks before, States, chart makers, navigation database suppliers and operators can all switch to new procedures, airspace and frequencies at the same moment.
What it is
AIRAC stands for aeronautical information regulation and control. It is the ICAO system that controls when significant changes to aeronautical information come into force. Instead of each State changing procedures whenever it likes, every State uses the same set of effective dates, one every 28 days, always a Thursday at 0000 UTC. Each date starts a new AIRAC cycle.
The AIP article explains how a State's AIP is organised and updated. This article goes deeper into the cycle itself: the timeline, who uses it and what it means on the flight deck.
Why it exists
A new SID or STAR, a changed frequency or a redrawn airspace boundary has to appear at the same moment in many places: the State's AIP, the charts in every chart provider's library, the flight management system database of every aircraft, the ATC systems and the flight planning systems. If those changed on different days, a crew could be flying a procedure that ATC no longer expects, or the FMS could hold a waypoint that has moved.
AIRAC prevents this by fixing the dates in advance and requiring the information to be sent out early enough for everyone to prepare.
What has to go through AIRAC
ICAO lists the kinds of change that must be published on an AIRAC date. In broad terms they include:
- Airspace: boundaries, classification and the hours or conditions of restricted, danger and prohibited areas when they are planned.
- ATS routes, holding procedures and instrument procedures such as departures, arrivals and approaches.
- Navigation aids and their frequencies, and positions and heights of significant obstacles.
- Communication frequencies and some aerodrome facilities.
- Changes to rules and procedures that affect operations, such as transition levels or altimeter setting.
Less important permanent changes can go out as non-AIRAC amendments. Temporary or urgent ones go out as NOTAM.
The timeline
Annex 15 and PANS-AIM set when information must leave the State and reach its users.
| Step | When |
|---|---|
| Distribution of AIRAC information | At least 42 days before the effective date |
| Major changes, where planned | Recommended at least 56 days before |
| Information reaches recipients | At least 28 days before |
| Effective date | Thursday, 0000 UTC |
| Next change to the same information | Not for at least another 28 days, unless temporary |
A State that has nothing to publish for a cycle sends a NIL notification, so users know nothing was missed. On the effective date, a trigger NOTAM can point to the change that has just come into force.
Cycles are named by year and number. In 2026, for example, cycle 2611 took effect on 29 October and cycle 2612 takes effect on 26 November.
Worked example
A fictional State plans a new RNP approach to come into force with cycle 2612, on 26 November 2026.
- By 15 October 2026 (42 days before) the AIRAC amendment must be distributed. As a major change it should ideally go out by 1 October (56 days before).
- During October and November, chart providers draw the new chart and database suppliers code the procedure, test it and ship it to operators.
- Operators load the database into their aircraft before the effective date. The FMS holds it as the next cycle.
- At 0000 UTC on 26 November the new approach is valid. The FMS switches to the new cycle, the new charts apply, and ATC can clear aircraft for it.
What it means for pilots
- Check the database at pre-flight. The FMS shows the active database and its effective period. Make sure it covers the time of the flight.
- Watch the changeover. A flight that crosses 0000 UTC on an AIRAC date may cross a database change. Follow your operator's procedure for which cycle to use and how to change over.
- Charts and database must match. Use charts of the same cycle as the database. A mismatch can mean a procedure on the chart that the FMS does not have, or the other way round.
- Read the NOTAM. AIRAC handles planned change. Anything urgent, temporary or late comes through NOTAM and AIP supplements.
Common mistakes
- Flying with an expired database without noticing, or without applying the operator's restrictions.
- Briefing from an old chart after the effective date.
- Assuming every change waits for AIRAC. Temporary changes and short-notice closures do not; they come by NOTAM.
- Forgetting the time zone. The effective time is 0000 UTC, which is not midnight local time in most of the world.
Frequently asked questions
Why 28 days?
Twenty-eight days is exactly four weeks, so every effective date falls on the same weekday, a Thursday. It also gives a regular rhythm that chart makers and database suppliers can plan production around.
How many AIRAC cycles are there in a year?
Usually 13. Because 13 cycles are 364 days, the dates move one day earlier each year, and occasionally a year has 14 effective dates.
What happens to my FMS database at the AIRAC date?
The navigation database has an effective period that matches the cycle. Most systems hold the current and the next cycle, and the crew checks at pre-flight that the active one is valid for the flight. Operators set rules for flying with an expired database.
Are NOTAM part of AIRAC?
No. NOTAM carry short-notice and temporary changes outside the cycle. A trigger NOTAM is used on the effective date to draw attention to an AIRAC change that has just come into force.
Related terms
Sources
- ICAO Annex 15: Aeronautical Information Services
- ICAO Doc 10066, PANS-AIM: Procedures for Air Navigation Services, Aeronautical Information Management
- ICAO Doc 8126, Aeronautical Information Services Manual