Approach sequencing
Also called Arrival sequencing, Arrival management, Sequencing for approach
Approach sequencing is how air traffic control puts arriving aircraft into a safe, orderly line for the runway. Controllers use radar vectors, speed control, holding and fixed route structures, often helped by an arrival manager, so each aircraft reaches final with the right spacing behind the one in front.
What it is
A runway can only take one landing at a time. Arrivals reach a busy airport from many directions, at different speeds and from different levels. Approach sequencing is the work of turning that stream into a single line, in a sensible order, with each aircraft spaced behind the previous one by at least the required separation or wake turbulence minimum.
Good sequencing does two jobs at once. It keeps aircraft safely apart, and it keeps the runway busy. A gap that is too large wastes capacity. A gap that is too small means a go-around for the follower.
Where sequencing happens
Sequencing is not one moment on final. It builds up in stages:
- Far out. In busy systems an arrival manager (AMAN) calculates a landing time for each flight. The area control centre may ask flights to slow down in cruise or start descent at a set time to meet it.
- Terminal area. Approach control merges the streams from each arrival route. Tools include radar vectors, speed control, holding and fixed structures such as point merge.
- Final approach. The controller fine-tunes spacing with small speed changes and the turn onto the final approach course, then hands over to the tower.
The tools
| Tool | How it works | Cost to the aircraft |
|---|---|---|
| Speed control | ATC assigns an indicated speed or Mach to open or close gaps | Lowest, small fuel effect |
| Path stretching | Vectors or an extended downwind lengthen the track flown | Extra distance at low level |
| Holding | Aircraft fly a racetrack at a fix until a slot opens | Fuel and time, often at higher level |
| Point merge | Aircraft fly an arc at a fixed distance from a merge point and are turned direct to it when the gap is right | Short arc flown, predictable |
| Time-based separation | Spacing on final set by time rather than distance, so strong headwinds cost less capacity | Little, handled by ATC |
Controllers mix these as traffic requires. With low traffic, a direct route and a STAR may be all that is needed. At a peak, the same flight may get a speed in cruise, a short hold and vectors at the end.
Speed control rules
Speed control by ATC is the main fine-tuning tool. ICAO PANS-ATM limits how it is used near the runway. On intermediate and final approach, only small speed changes, of not more than 20 kt, should be used, and speed control should not be applied after the aircraft passes a point 4 NM from the threshold on final. That leaves the last part of the approach for the crew to stabilise. Local procedures often publish standard speeds, such as a set speed to a fix or to a given distance on final, and the AIP of each State gives them.
If a speed would take the aircraft outside its normal envelope, for example too slow when heavy and clean, or below minimum manoeuvring speed for the configuration, the crew tells ATC straight away.
A worked example
Skyline 123 is number four for landing. Approach gives:
- "Skyline 123, reduce speed 220 knots." The aircraft ahead is slower, so the controller closes the gap less quickly.
- "Turn left heading 250, descend 4,000 feet." A short downwind stretch to slot in behind a heavier aircraft that needs a larger wake gap.
- "Reduce speed 180 knots, turn left heading 190, cleared ILS approach runway 27." The final turn places the aircraft at the right distance behind the leader.
- "Maintain 160 knots until 4 miles." The leader is on the same speed, so spacing stays fixed until the final reduction.
The crew plans the configuration to meet each speed and says "unable" early if a combination will not work, for example a high speed together with a steep late descent.
What pilots can do to help
- Meet assigned speeds promptly and tell ATC early if you cannot.
- Read the expected approach time or the expected delay and plan fuel and diversion decisions with it.
- Plan descent so that a shortcut does not leave you high on final.
- Listen to the frequency: the traffic picture tells you whether to expect a direct routing or a long downwind.
Common mistakes
The usual errors are slowing early "to be safe" and opening a gap the next aircraft has to fill, accepting a shortcut that makes a stabilised approach impossible, and reducing below the assigned speed before the point ATC gave. Another is not saying "unable" when a speed is outside the envelope, which leaves the controller with a sequence that cannot work.
Frequently asked questions
Why does ATC give me a speed long before the approach?
Sequencing starts well before the terminal area. Small speed changes in cruise or early descent absorb delay with less fuel and noise than vectors or holding later.
Can I refuse a speed from ATC?
If a speed is not possible for your aircraft or would be unsafe, say so at once. ATC will give another speed or another solution. Do not accept it and then fly something else.
What does "number three" mean in a clearance?
It is your place in the landing sequence. It tells you how many aircraft are ahead and helps you plan your descent and configuration, but it is not a clearance to land.
Related terms
Sources
- ICAO Doc 4444, PANS-ATM: speed control and approach sequencing
- ICAO Doc 9426, Air Traffic Services Planning Manual
- EUROCONTROL: Arrival Manager (AMAN) concept and implementation guidance
- FAA Aeronautical Information Manual, chapter 5: arrival procedures