Skip to content
Air traffic controlSafetyRegulation

Alerting service

Also called INCERFA, ALERFA, DETRESFA, Emergency phases, Uncertainty, alert and distress phases

Updated 18/11/20264 min read
In short

The alerting service is the air traffic service that tells search and rescue when an aircraft needs help, and helps them as needed. ICAO Annex 11 defines three emergency phases that it declares in order: uncertainty (INCERFA), alert (ALERFA) and distress (DETRESFA), each triggered by set conditions and time limits.

Defined inICAO Annex 11, Chapter 5
PhasesINCERFA, ALERFA, DETRESFA
Uncertainty after30 min without news

What it is

ICAO lists three air traffic services: air traffic control, flight information and alerting. The alerting service is the least visible of the three and the one pilots hope never to need. Its job is simple to state: notify the right organisations when an aircraft needs search and rescue (SAR) help, and assist them for as long as needed.

It applies to:

  • every aircraft receiving an air traffic control service;
  • as far as practicable, every other aircraft that has filed a flight plan or is otherwise known to ATS;
  • any aircraft known or believed to be the subject of unlawful interference.

In practice the flight information centre or area control centre of the region is the central point. It collects all information about an aircraft in difficulty and passes it to the rescue coordination centre (RCC). Other units, such as a tower or approach unit, notify their parent centre first, unless the situation is so urgent that they alert local rescue services directly.

The three emergency phases

Annex 11 groups emergencies into three phases. The names come from the old telegraphic codes and are still used in ATS messages.

PhaseCodeMain triggers (ICAO Annex 11)
UncertaintyINCERFANo communication within 30 minutes of when it was due, or of the first failed attempt to call the aircraft, whichever is earlier; or the aircraft has not arrived within 30 minutes of the last notified or estimated arrival time, whichever is later
AlertALERFAAfter uncertainty, further calls and enquiries bring no news; or an aircraft cleared to land has not landed within 5 minutes of the estimated landing time and contact has not been re-established; or information shows its operating efficiency is impaired, but not so far that a forced landing is likely; or it is known or believed to be under unlawful interference
DistressDETRESFAAfter alert, wider enquiries fail and point to the aircraft being in distress; or its fuel is considered exhausted or not enough to reach safety; or its operating efficiency is impaired so far that a forced landing is likely; or it is about to make, or has made, a forced landing

Two points are easy to miss. First, the 30-minute rules do not apply when no doubt exists about the safety of the aircraft and its occupants: a known radio failure on a flight that is otherwise behaving normally is one example. Second, the phases are not a fixed ladder. A unit declares whichever phase fits what it knows, so a MAYDAY or a reported forced landing goes straight to distress.

What ATS does in each phase

Uncertainty. The unit tries to establish contact and to find out where the aircraft is. It calls on frequency, asks other ATS units, checks the departure and destination aerodromes and may ask the operator. Much of this happens without the crew ever knowing, and most cases end here: a late position report, a wrong frequency, a forgotten flight plan.

Alert. The RCC is notified and starts preparing. Rescue units may be placed on standby. The ATS unit passes everything it has: the flight plan, the last known position and time, the colour and markings of the aircraft if known, and any message received.

Distress. The RCC takes charge of the search and rescue action. ATS keeps helping with information, relays messages and warns other aircraft in the area where useful.

Throughout, the unit also keeps the operator informed, and it tells other aircraft near an aircraft in an emergency what they need to know.

Worked example

A fictional single-engine aircraft files a VFR flight plan for a 90-minute flight, estimated to arrive at 1430 UTC. The pilot lands at 1420 but forgets to close the plan and goes home.

  1. 1500 UTC. The aircraft has not arrived within 30 minutes of its estimate. The destination unit cannot see it and the arrival has not been reported. The centre declares INCERFA and starts making enquiries.
  2. Enquiries. It phones the destination aerodrome, the departure aerodrome and the operator or the contact number in the flight plan.
  3. If nothing turns up, the centre declares ALERFA and notifies the RCC. In this case a hangar worker confirms the aircraft is parked, the pilot is reached by phone and the action is cancelled.

The cost of a forgotten flight plan is real: people and sometimes aircraft are put to work. The same chain, without the happy ending, is what brings help quickly to a crew that has actually landed in a field.

Learn it properlyAir Law and ATS trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

FAA and other differences

The ICAO structure is used worldwide, but States publish their own detail. In the United States, a VFR flight plan is kept by flight service, and search and rescue procedures begin if the pilot has not closed or extended it within 30 minutes of the estimated arrival time. Many States run similar systems through their flight information service. Operators of commercial flights add their own flight-watch procedures on top of ATS alerting.

What pilots can do

  • File and close. A flight plan is what makes you known. Close it after landing, by radio or by phone, wherever you land.
  • Keep ATS informed. If you divert or will be late, update your estimate. That alone avoids most uncertainty phases.
  • Use the right squawk. 7700 for an emergency and 7600 for radio failure tell the controller what is happening before you say a word. See squawk codes.
  • Say it early. A PAN PAN or MAYDAY lets ATS skip straight to the right phase.
Remember: alerting service starts from what ATS knows. If nobody knows where you are going or when you should arrive, nobody will start looking.

Frequently asked questions

Do I get alerting service on a VFR flight?

If you filed a flight plan or ATS otherwise knows about your flight, ICAO says alerting service should be provided as far as practicable. Without a flight plan or contact with ATS, nobody knows you are overdue.

What happens if I forget to close my VFR flight plan?

The ATS unit starts by trying to find you, by phone and through other units. If that fails, the phases follow and search and rescue can be launched. Always close the plan, even after landing somewhere else.

Does a MAYDAY skip the earlier phases?

Yes. The phases are declared according to the situation, not one after the other by default. A distress call or a forced landing goes straight to the distress phase.

Who actually runs the search?

The rescue coordination centre (RCC). The ATS unit declares the phase, passes all it knows and keeps helping, but the RCC plans and directs search and rescue.

Sources

  1. ICAO Annex 11: Air Traffic Services, Chapter 5, Alerting service
  2. ICAO Doc 4444, PANS-ATM: emergency procedures and the alerting service
  3. FAA Aeronautical Information Manual, chapter 6: emergency procedures and search and rescue
Spotted a mistake, or something missing?Suggest an edit