Air traffic flow management

Also called ATFM, Flow control, ATFCM, Air traffic flow and capacity management

Updated 23/11/20264 min read
In short

Air traffic flow management (ATFM) is the service that balances the number of flights against what airports and sectors can safely handle. When demand is too high, it delays aircraft on the ground, reroutes them or caps their levels, so that queues do not build up in the air. Europe calls it ATFCM; the United States runs it from a national command centre.

ICAO manualDoc 9971
EuropeEUROCONTROL Network Manager
United StatesFAA ATCSCC

What it is

Every airport and every ATC sector has a capacity: the number of aircraft it can handle safely in a given time. A runway might take 40 arrivals an hour in good weather and far fewer in low visibility. An en-route sector might accept a set number of flights an hour before its controller is overloaded. When the flights planned for a place outnumber its capacity, something has to give.

Air traffic flow management (ATFM) is the service that sees this coming and smooths it out. It compares the demand from filed flight plans with declared capacity and, where demand is too high, spreads the traffic over time or space. The aim is simple: keep the queues on the ground, where waiting is cheap and safe, rather than in holding stacks.

ICAO requires ATFM where traffic demand at times exceeds, or is expected to exceed, the declared ATC capacity, and describes a collaborative model in Doc 9971. In Europe the wider term air traffic flow and capacity management (ATFCM) is used, because the first step is to make more capacity, not only to restrict traffic.

How it works

ATFM works in phases, from long before the day to the day itself.

PhaseWhen (European usage)What happens
StrategicSeven days or more aheadCapacity plans, sector openings, route schemes, events and military exercises
Pre-tacticalSix days to the day beforeThe plan for the day is agreed and published
TacticalThe day of operationLive monitoring, regulations, slots and reroutes
Post-operationsAfter the dayAnalysis of delays and what could be done better

On the day, flow managers watch the expected traffic count in each sector and at each airport. When a count goes above capacity, they apply a measure.

The measures

  • Ground delay. Flights bound for the busy place get a departure time later than they planned. In Europe this is a CTOT, the calculated take-off time. In the United States it is an expect departure clearance time (EDCT), part of a ground delay programme.
  • Ground stop. In the United States, departures to an airport are held entirely for a while, for example when a thunderstorm closes it.
  • Rerouting. Flights are offered or required to take another route around a congested sector or bad weather.
  • Level capping. Flights are kept below or above a level so they stay out of an overloaded sector.
  • Miles-in-trail or minutes-in-trail. ATC units agree to hand over traffic with a set spacing, which slows the flow without slots.
  • Airborne holding. The last resort, when the problem arrives too suddenly for ground measures.

Who does it

In Europe, the EUROCONTROL Network Manager runs ATFM centrally for the whole area, with flow management positions at each area control centre. See Eurocontrol Network Manager.

In the United States, the FAA's Air Traffic Control System Command Center (ATCSCC) coordinates traffic management units at the en-route centres and large terminal facilities.

Other regions run their own systems, and more of them now share data across borders so that a flight is not regulated twice for the same problem.

Example

A fictional hub expects 52 arrivals between 1700 and 1800 UTC, but a forecast of low visibility cuts its arrival rate to 30. The flow unit creates a regulation for that hour. Flights from across the network are given departure slots that spread their arrivals over the next two hours. A flight scheduled to leave at 1500 UTC gets a CTOT of 1540. The crew boards as planned, the airport adjusts the start-up time, and the aircraft takes off within the slot window, arriving when there is room instead of holding for forty minutes.

Learn it properlyAir Law and ATS trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

Collaboration

Modern ATFM is shared work. Airlines tell the system when aircraft will really be ready; airports using A-CDM send target off-block and take-off times; ATC units declare capacity sector by sector. The better the data, the fewer flights are delayed for no reason. A flight plan with the wrong departure time, or a flight that never leaves, takes a slot another aircraft could have used.

Remember: a slot is not a clearance. The flight still needs its ATC clearance, and taking off outside the window means asking for a new time.

What pilots do

  • Check the slot before going to the aircraft. Plan the turnaround and the start-up around the departure time, not the schedule.
  • Keep the operator informed. If the aircraft will be late or early, a delay or ready message can save a missed slot.
  • Take fuel decisions seriously. A slot does not remove the chance of holding on arrival.
  • Ask about options. A different route or level can sometimes remove the regulation entirely.

Common mistakes

  • Starting up early and taxiing to wait at the holding point, which blocks others and burns fuel.
  • Assuming ATFM delay is ATC being slow. It is often weather or capacity hundreds of miles away.
  • Forgetting to update the flight plan after a long technical delay, so the system plans for a flight that is not there.

Frequently asked questions

Is ATFM the same as air traffic control?

No. ATC separates the aircraft in front of it now. ATFM works hours or days ahead and manages how many aircraft arrive in a sector or at an airport, so controllers are not overloaded.

Why delay a flight on the ground instead of in the air?

A delay on the stand burns almost no fuel and adds no workload. The same delay spent holding costs fuel, crowds the airspace and leaves less margin for the unexpected.

What causes most ATFM delays?

Usually en-route or airport capacity, weather, and staffing or equipment problems at an ATC unit. The regulation that applies to a flight carries a reason code that says which.

Can the crew do anything about a slot?

The operator can ask for an improvement, accept a reroute or a different level that avoids the restriction, or send a ready message when the aircraft can leave at short notice. The crew mostly makes sure it can meet the time it is given.

Sources

  1. ICAO Doc 9971, Manual on Collaborative Air Traffic Flow Management
  2. ICAO Doc 4444, PANS-ATM: air traffic flow management
  3. ICAO Annex 11, Air Traffic Services: air traffic flow management
  4. EUROCONTROL: ATFCM Users Manual
  5. FAA Aeronautical Information Manual, chapter 5: traffic management programs
Spotted a mistake, or something missing?Suggest an edit