Skip to content
RegulationFlight operationsHuman factors

Part-ORO

Also called Organisation Requirements for Air Operations, Annex III to Regulation (EU) No 965/2012, EASA Part-ORO

Updated 09/11/20264 min read
In short

Part-ORO is the part of the EU Air OPS Regulation that sets the organisation requirements for air operators. It covers the management system, the air operator certificate, the operations manual, crew training and checking, and flight and duty time limits. Operation rules such as Part-CAT then say how each flight is flown.

Legal sourceReg. (EU) No 965/2012, Annex III
Applies toCAT, NCC and SPO operators
Authority sidePart-ARO (Annex II)

What it is

Part-ORO, short for Organisation Requirements for Air Operations, is Annex III of Commission Regulation (EU) No 965/2012, the EU Air Operations Regulation. It applies in the member States of EASA and in the other countries that apply EASA rules.

Air OPS is split into parts. Some describe the authority, some the organisation, and some how flights are flown. Part-ORO is the organisation layer. It answers the question: what must a company have in place before, and while, it operates aircraft?

AnnexPartCovers
IIPart-AROWhat the competent authority must do
IIIPart-OROWhat the operator as an organisation must have
IVPart-CATCommercial air transport operations
VPart-SPASpecific approvals (for example low visibility, ETOPS, PBN)
VIPart-NCCNon-commercial operations with complex aircraft
VIIPart-NCONon-commercial operations with other-than-complex aircraft
VIIIPart-SPOSpecialised operations

Each rule comes with Acceptable Means of Compliance (AMC) and Guidance Material (GM), published by EASA. They show how to meet the rule and explain its intent.

Who it applies to

Part-ORO applies to commercial air transport (CAT) operators, which need an air operator certificate, and to operators of complex aircraft in non-commercial operations and to specialised operators, which in most cases declare their activity instead of holding a certificate. Not every subpart applies to every operator: much of the crew training material is written for CAT.

The subparts

SubpartContent
GENGeneral requirements: management system, personnel, facilities, occurrence reporting, changes
AOCAir operator certification: application, privileges, nominated persons
DECDeclaration for operators that do not need a certificate
SPOAuthorisation of high-risk commercial specialised operations
MLRManuals, logs and records
SECSecurity
FCFlight crew
CCCabin crew
TCTechnical crew in certain helicopter and night vision operations
FTLFlight and duty time limitations and rest requirements

Management system

Subpart GEN requires a management system with clear lines of responsibility, an accountable manager with the authority to make sure operations can be financed and done to the required standard, and a safety management system that identifies hazards and manages risk. It also requires compliance monitoring, so the operator checks its own work against the rules.

A CAT operator must appoint nominated persons for key areas, such as flight operations, crew training, ground operations and continuing airworthiness. The authority accepts these people before they take up the post.

Learn it properlyAir Law and ATS trackShort units by airline pilots and a quiz at the end of each module. Your progress is saved.See the track

Operations manual

Subpart MLR sets out the operations manual, the operator's main document for crews. For CAT it is normally organised in four parts:

  • Part A: general and basic policies, such as duties, fuel policy, minima policy and flight time limits.
  • Part B: aircraft operating matters for each type, such as procedures, limitations and performance.
  • Part C: route, area and aerodrome instructions.
  • Part D: training.

The manual must be kept up to date, and crew must have access to the parts relevant to their duties.

Flight crew training and checking

Subpart FC is the part most pilots meet directly. It sets what the operator must do on top of the licence requirements of Part-FCL. Main elements include:

  • Operator conversion training before a pilot flies a new type or joins a new operator, including line flying under supervision.
  • Differences and familiarisation training for variants and new equipment.
  • Command course for pilots upgrading to commander.
  • Crew resource management training (ORO.FC.115), built into initial and recurrent training. See crew resource management.
  • Recurrent training and checking, including the operator proficiency check (OPC) in the simulator, line checks, and emergency and safety equipment training.
  • Rules for flying more than one type or variant, and for operating from either seat.

The validity periods for each check are set in the rule and its AMC. Operators publish the resulting schedule in Part D of the operations manual. Many operators run these programmes as evidence-based training, which Air OPS allows as an alternative way to organise recurrent training.

Flight and duty time limits

Subpart FTL, together with the certification specifications CS-FTL.1, sets limits on flight duty periods, total duty, flight time and rest, and requires operators to manage fatigue. The details are covered in flight time limitations.

How it relates to ICAO and the FAA

Part-ORO turns ICAO standards into EU law. Its operator requirements follow ICAO Annex 6, Part I, and its safety management rules follow Annex 19. In the US, the same ground is covered by several rules: 14 CFR Part 119 for certification, Parts 121 and 135 for training and checking, Part 117 (and Part 135 subpart F) for flight and duty limits, and Part 5 for safety management systems.

Remember: your licence says you can fly the aircraft. Part-ORO is why your operator still has to train and check you before you fly it for them.

A worked example

A fictional first officer with a type rating on one aircraft joins a new CAT operator flying the same type. Part-FCL is already met, but Part-ORO still applies. The pilot completes the operator's conversion course: ground training on the company procedures in the operations manual, simulator training and an OPC, emergency and safety equipment training, then line flying under supervision and a line check. Only then can the pilot be scheduled as a normal crew member.

Frequently asked questions

What is the difference between Part-ORO and Part-CAT?

Part-ORO says what the operator as an organisation must have: management, manuals, training and duty limits. Part-CAT says how commercial flights are actually operated, for example fuel, minima and performance.

Does Part-ORO replace my licence requirements?

No. Part-FCL sets what you need to hold a licence and rating. Part-ORO adds what the operator must train and check before and while you fly for it, such as conversion training, line checks and recurrent checks.

Are the AMC part of the law?

Acceptable Means of Compliance are not law themselves. They are one accepted way to meet the rule. An operator can use an alternative means if it shows the authority that it meets the rule to the same level.

Sources

  1. Commission Regulation (EU) No 965/2012 (Air OPS), Annex III: Part-ORO
  2. EASA Air OPS, AMC/GM to Part-ORO
  3. ICAO Annex 6, Part I: Operation of Aircraft, International Commercial Air Transport, Aeroplanes
  4. ICAO Annex 19: Safety Management
Spotted a mistake, or something missing?Suggest an edit