Destination alternate
Also called Destination alternate aerodrome, Destination alternate airport, Second alternate
A destination alternate is an aerodrome named in the flight plan where a flight can go if it becomes impossible or unwise to land at its destination. It must meet planning weather minima for the expected time of use, and the fuel to fly a missed approach at the destination and continue to it is carried from departure.
What it is
A destination alternate is one of the three kinds of alternate aerodrome defined by ICAO (the others are the take-off alternate and the en-route alternate). It is the place the flight plans to go if it reaches its destination and cannot land there: the weather is below minima, the runway is closed, an aircraft is stuck on it, or the approach has failed and another attempt is not sensible.
The destination alternate is written in item 16 of the ATC flight plan and in the operational flight plan. It shapes the fuel figure, so choosing it is one of the first decisions in flight planning. For the broader picture of all three types, see alternate aerodromes.
When one is required
The general ICAO rule is that a flight under instrument flight rules needs at least one destination alternate. States and operators may drop that requirement in two kinds of case:
- The destination is good enough on its own. The flight is short enough, and the forecast for a period around the arrival time is good enough, that there is reasonable certainty of being able to land. Many rules also expect separate runways, so that one blocked runway does not close the airport.
- The destination is isolated. No suitable alternate exists within a reasonable distance, for example on a remote island. The flight then carries extra fuel to hold at the destination instead, and the operator decides a point of no return beyond which it is committed.
The exact conditions differ by authority:
| Authority | No alternate needed when (simplified) |
|---|---|
| FAA, 14 CFR 91.169 | From 1 h before to 1 h after the ETA, forecast ceiling at least 2,000 ft and visibility at least 3 SM |
| FAA, Part 121 domestic | Similar window, with a higher ceiling and visibility linked to circling minima and the approaches available |
| EASA, CAT.OP.MPA | Conditions on flight time, separate usable runways and the forecast around the ETA, or an isolated aerodrome; details in the operator's approved scheme |
Under ICAO and EASA rules, two destination alternates are usually needed when the destination forecast is below minima for the expected time of use, or when there is no weather information for it.
Choosing a suitable one
A good destination alternate is more than the nearest airport on the map. The crew and dispatcher check:
- Weather. The TAF must show conditions at or above the planning minima for the expected time of use, including any
TEMPOorPROBgroups the operator's rules count. - Planning minima. These are higher than the landing minima to cover forecast error. A widely used scheme adds about 200 ft and 800 m to the minima of a precision approach, and more for non-precision or circling approaches. Operators publish their own values.
- Runway and performance. Runway length, condition and declared distances must suit the aircraft at its expected landing weight.
- Services. Opening hours, fire and rescue category, ATC, fuel, handling and customs.
- NOTAMs. Closures, unserviceable approaches or works that could make it unusable at the time.
- Distance and fuel. A closer alternate saves fuel and payload; a farther one may have better weather or facilities.
Fuel for the alternate
The alternate shapes the alternate fuel element of the fuel plan. It covers a missed approach at the destination, the climb, cruise to the alternate at the planned level, the descent, an approach and the landing. Final reserve fuel comes on top: for turbine aeroplanes, typically 30 minutes of holding at 1,500 ft above the alternate.
Worked example (fictional): EXAMPLE 123 is planned to a coastal destination where fog is forecast to lift slowly. The dispatcher compares two alternates. Alternate A is 90 NM away, with a TAF that shows TEMPO fog in the same period as the destination. Alternate B is 160 NM inland, with a forecast well above planning minima. B costs about 600 kg more alternate fuel, but A is likely to suffer the same weather that would cause the diversion. B is the better choice, and the extra fuel is planned in.
In flight
The planned alternate is the basis for dispatch, not a fixed instruction. During the flight the crew keeps checking the destination and alternate weather. If the alternate deteriorates, they look for another suitable aerodrome and recalculate the fuel. Before starting the approach at the destination they confirm the minimum fuel needed to divert, so the decision to go around and leave is made with fuel to spare rather than at the last moment.
Common mistakes
Typical errors are picking an alternate that shares the destination's weather, forgetting to apply planning minima rather than landing minima, missing a NOTAM that closes the only suitable approach, and ignoring opening hours on night arrivals. In flight, crews sometimes spend too long holding at the destination and reach the diversion decision with only reserve fuel left, which removes any choice of where to go.
Frequently asked questions
When are two destination alternates needed?
Under ICAO and EASA rules, typically when the destination forecast is below the applicable minima for the expected time of use or when no weather information is available for it. Operators publish the exact conditions in their operations manual.
Does the alternate have to be the one I actually divert to?
No. It is the planning basis for weather and fuel at dispatch. In flight the commander chooses the most suitable aerodrome, which may be a different one if it is closer or has better weather.
Can the destination alternate be the departure aerodrome?
Yes, if it meets the same planning minima and the fuel calculation includes the return. It is common on short sectors.
What is the FAA 1-2-3 rule?
Under 14 CFR 91.169, an IFR flight needs an alternate unless, from one hour before to one hour after the estimated time of arrival, the destination forecast shows a ceiling of at least 2,000 ft and visibility of at least 3 statute miles.
Related terms
Sources
- ICAO Annex 6, Part I: selection of destination alternate aerodromes and fuel requirements
- EASA Air OPS, CAT.OP.MPA: selection of aerodromes and planning minima, with AMC/GM
- 14 CFR §91.169: IFR flight plan, information required (alternate requirements)
- 14 CFR Part 121, subpart U: dispatching and flight release rules (alternate requirements)